Start with the architecture
Explore the 48V DC system approach, central power and decoding, and the GATEway control layer. Confirm voltage for each selected product.
Colorbeam for Integrators
Coordinate the fixtures, power equipment and controls from the first project conversation.
Explore the possibilitiesBuilt around your role
The lighting experience depends on the relationship between the products, the wiring and the control design.

Explore the 48V DC system approach, central power and decoding, and the GATEway control layer. Confirm voltage for each selected product.
Bring the proposed control platform and required scenes to the discussion. Confirm the current integration path, driver and configuration.
Agree on zoning, addressing, scene intent, equipment access and handover documentation before installation.
A practical next step
Share plans, fixture requirements, control platform and the scope your team will deliver.
Review the selected fixtures, power supplies, decoders and control requirements together.
Discuss commissioning, system documentation and current technical support arrangements.
Continue exploring

A Colorbeam project
Explore the residential design, fixture choices and control experience in this published Colorbeam project.
Read the project story ↗Questions before you start
No. Do not assume ordinary Ethernet PoE compatibility. Confirm the Colorbeam wiring and connection requirements for the selected components.
No. Some tape products use 24V. Confirm the exact model, voltage, power supply and decoder combination.
Colorbeam's live professional hub describes an authorized reseller program. Contact the team for current requirements, terms and availability.
Start a conversation
Tell us the project location, stage and the people involved. Bring drawings if you have them.